Six robots.
One decision.
Each model is engineered for a specific industrial application. Compare specs, download datasheets, or talk to our applications team.

RS-900X
RS-900X Heavy Arm
Maximum payload for maximum throughput.
Payload
900 kg
Reach
3.2 m
Speed
2.1 m/s
Axes
6-axis
Use cases: Automotive stamping, aerospace frame assembly, heavy weld
Request Quote
RS-240C
RS-240C Cobot
Works beside your team — safely.
Payload
240 kg
Reach
1.8 m
Safety
ISO 10218
Axes
7-axis
Use cases: CNC tending, pick & place, quality inspection
Request Quote
RS-AGV4
RS-AGV4 Navigator
Fleet logistics, fully automated.
Capacity
1,200 kg
Speed
1.8 m/s
Nav
SLAM + LiDAR
Battery
10h
Use cases: Warehouse logistics, intralogistics, kitting
Request Quote
RS-DELTA3
RS-DELTA3 Picker
220 picks per minute. Zero misses.
Picks
220/min
Payload
3 kg
Cycle
0.27s
Vision
Integrated
Use cases: Food & beverage, pharma packaging, electronics
Request Quote
RS-WELD6
RS-WELD6 Arc
Consistent welds at production scale.
Process
MIG / TIG
Accuracy
±0.03mm
Torch
Water-cooled
Duty
100%
Use cases: Structural steel, pipe fabrication, shipbuilding
Request QuoteBuilt for operations,
not just demos.
Every robot in our lineup shares the same core platform — meaning one training program, one spare-parts inventory, and one support contract for your entire fleet.
99.7%
Average uptime across deployed units
340+
Facilities running RobotShowcase hardware
< 6 wks
Typical commissioning to production
24 / 7
Remote monitoring & support coverage

Live Fleet Status
99.7%
Uptime · 340 units online
Seamless Integration
Native connectors for Fanuc, Siemens, Rockwell PLC environments. EtherNet/IP, PROFINET, OPC-UA out of the box.
Real-Time Analytics
On-unit telemetry streams OEE, cycle time, and fault data to your MES or our cloud dashboard — no middleware required.
Certified Safety
ISO 10218-1/2, ANSI/RIA R15.06, CE marked. Every unit ships with full safety documentation for your compliance team.
Predictive Maintenance
Onboard ML detects bearing wear, backlash drift, and thermal anomalies 72 hours before failure. Cut unplanned downtime by 61%.
Trusted by the
facilities that can't afford downtime.

+38%
Throughput increase
Results
that show
up on the
balance sheet.
"We replaced three legacy systems with a single RS-900X cell. Throughput is up 38%, and we've had zero unplanned downtime in 14 months. The commissioning team had us running in under five weeks."
Marcus Heller
VP of Manufacturing Operations
Meridian Structural Components, Detroit